In May 2026, EPA finalized a reconsideration of its Technology Transitions rule under the American Innovation and Manufacturing Act, published at 91 Fed. Reg. 31284 and effective July 27, 2026. It pushed several compliance deadlines out and raised the interim global warming potential ceilings that new refrigeration equipment has to meet. We covered what changed in our earlier piece on what the 2026 Technology Transitions rule means for used equipment buyers. Since then the rule has been challenged from both directions, and buyers planning capital purchases around the extended deadlines are right to ask what happens if it does not survive.
QUICK ANSWER
Five petitions now challenge EPA’s May 2026 HFC rule in the D.C. Circuit, filed by environmental groups, state attorneys general, and HVACR trade associations alike. The rule remains in force and no court has ruled. For used equipment buyers the exposure is narrower than the headlines suggest: the regulation restricts manufacture, import, sale, and installation, not ownership or continued operation. Ammonia and CO2 sit outside it entirely. The risk that matters is the installation restriction, and it attaches to the owner and operator, not just the contractor.
Five petitions, and they do not all want the same thing
What makes this litigation unusual is the alignment. This is not environmental groups on one side and industry on the other. Per EPA’s docket of petitions for judicial review, five petitions are now pending in the D.C. Circuit:
- HARDI, PHCC, and ACCA filed June 24, 2026 (No. 26-1168), arguing that extending demand for legacy refrigerants while AIM Act supply caps tighten will disrupt the market and raise refrigerant costs.
- AHRI and the Alliance for Responsible Atmospheric Policy filed June 25, 2026 (No. 26-1174).
- The Natural Resources Defense Council filed July 20, 2026 (No. 26-1188), arguing EPA extended purchase deadlines by five or more years in violation of the AIM Act.
- Eighteen state attorneys general, the District of Columbia, and the City of New York filed July 21, 2026.
- ALTA Refrigeration and CUSER filed July 24, 2026 (No. 26-1202).
On the other side, a retail coalition including the Retail Litigation Center, FMI, the American Frozen Food Institute, and the National Grocers Association moved to intervene in support of EPA. Supermarket operators want the extra runway. Contractor and manufacturer groups want the certainty of the original schedule. As of this writing no court has ruled, no stay has been sought or granted in any public filing we could locate, and the rule is in effect.
Read the regulation, not the headline
The Technology Transitions restrictions live at 40 CFR 84.54, and the section is built in three parts. Paragraph (a) prohibits manufacture and import of covered products. Paragraph (b) prohibits sale and distribution of those products, effective three years after the paragraph (a) dates. Paragraph (c) prohibits installation of covered systems. There is no paragraph restricting use, operation, or continued operation, and EPA’s sector guidance says the same thing: the restrictions apply to new equipment, with no mandate to replace or retrofit what is already installed.
That structure matters more to a used equipment buyer than the litigation does. Cold storage warehouse systems, supermarket systems, and remote condensing units appear in paragraph (c) only. They are field-assembled, so the rule governs who may install them, not who may sell them. Industrial process refrigeration chillers and non-chiller IPR products do appear in paragraph (a), so a sale restriction attaches, but it is offset three years from the manufacture and import date.
The exposure is in the installation restriction
Paragraph (c) is worth quoting because of who it reaches: no person may install any system, nor have any such system be installed through their position as a designer, owner, or operator. The prohibition runs to the owner and the operator, not only the mechanical contractor holding the wrench.
The provenance of the hardware is irrelevant to that paragraph. It is written about the act of installing a system, so a used high-GWP system field-assembled after the applicable date is restricted conduct exactly as a new one would be. The date you complete and charge the circuit is the date that counts.
The current interim ceilings are 700 GWP for cold storage warehouse systems and 1,400 GWP for supermarket systems and remote condensing units. All three drop to 150 GWP at or above a 200 pound charge, and 300 GWP below it, on January 1, 2032. Those 2032 limits were not moved by the reconsideration rule, and no petitioner is asking the court to move them.
What a vacatur would and would not do
Nobody can tell you how the D.C. Circuit will rule. What we can say is what the closest precedent shows. In Clean Air Council v. Pruitt, decided July 3, 2017, the D.C. Circuit vacated EPA’s stay of methane rule requirements and the original compliance deadline sprang back into effect.
The comparison is imperfect. That case involved a short administrative stay. The May 2026 rule is a final legislative rule that amended the codified text at 40 CFR 84.54 through notice and comment. Whether vacating it would restore the prior text, produce a remand without vacatur, or take prospective effect only is not a question any published legal commentary we found has answered. Treat the pre-May-2026 deadlines as a live possibility, not a certainty, and price accordingly.
The equipment that is unaffected either way
Every restriction in section 84.54 applies to equipment using a regulated substance, meaning the listed HFCs. EPA’s preamble to the May 2026 rule states that CO2, hydrocarbons, and ammonia are not fluorinated chemicals. Ammonia (R-717) and CO2 (R-744) carry no GWP limit under this rule. Whatever the court does, a surplus ammonia screw package or a used chiller on an A1 refrigerant is outside the fight.
Our pieces on transcritical CO2 versus ammonia for industrial refrigeration and low-charge ammonia systems go into where each one fits.
What to do while the case is pending
- Separate the purchase decision from the installation decision. Buying a used high-GWP system is not the restricted act. Completing and charging its circuit after the applicable date is.
- Get the charge weight and refrigerant in writing before you buy. The 200 pound threshold sets the 2032 tier, and the refrigerant decides whether the rule touches the machine at all.
- Do not confuse this rule with the refrigerant handling rules, which we covered in the 2026 reclaim rules and refrigerant reclamation and recovery.
- If your timing sits close to a deadline, price the schedule against the original dates as well as the extended ones. For a project that has to be insulated from the outcome entirely, specify ammonia or CO2.
The rule is in force today, and its deadlines are the ones you have to meet now. But a compliance case built on an interim ceiling that five parties are asking a federal court to throw out is thinner than it looks. Confirm the refrigerant and charge, and keep the rest of the documentation that travels with the asset in order.
Frequently Asked Questions
Refrigeration Equipment Pros stocks surplus ammonia, CO2, and halocarbon equipment from plant decommissionings across North America. Browse current inventory at refrigerationequipment.net/shop, submit equipment you need to move through our Sell To Us page, or call or text 201-805-1441 to talk through a specific machine with someone who knows the equipment.
About the Author
Michael Rosenberg writes on the industrial refrigeration equipment market for Refrigeration Equipment Pros, a surplus and used equipment dealer with more than 25 years in ammonia and halocarbon systems, plant decommissioning, and equipment valuation. The company operates warehouse locations in Newfield, New Jersey, Houston, Texas, and Patterson, California. This article is general information about federal regulation and is not legal advice.
Sources
- Federal Register, Phasedown of Hydrofluorocarbons: Reconsideration of Certain Regulatory Requirements Promulgated Under the Technology Transitions Provisions of the AIM Act, 91 Fed. Reg. 31284, May 26, 2026: https://www.federalregister.gov/documents/2026/05/26/2026-10387/phasedown-of-hydrofluorocarbons-reconsideration-of-certain-regulatory-requirements-promulgated-under
- 40 CFR 84.54, Restrictions on use of regulated substances in sectors or subsectors, eCFR: https://www.ecfr.gov/current/title-40/chapter-I/subchapter-C/part-84/subpart-B/section-84.54
- EPA, Petitions for Reconsideration and Judicial Review of the October 2023 Technology Transitions Rule, updated August 13, 2026: https://www.epa.gov/hfcs/petitions-reconsideration-and-judicial-review-under-aim-act
- EPA, Technology Transitions HFC Restrictions by Sector, updated August 28, 2026: https://www.epa.gov/hfcs/technology-transitions-hfc-restrictions-sector
- NRDC, NRDC Sues EPA Over Costly Refrigerant Rollback, July 20, 2026: https://www.nrdc.org/press-releases/nrdc-sues-epa-over-costly-refrigerant-rollback
- State Petition for Review, Commonwealth of Massachusetts, et al. v. EPA, filed July 21, 2026: https://coag.gov/app/uploads/2026/07/State-Petition-for-Review-HFCs.pdf
- ACHR News, EPA Faces New Lawsuits Over HFC Refrigerant Rule Rollback, July 23, 2026: https://www.achrnews.com/articles/166470-epa-faces-new-lawsuits-over-hfc-refrigerant-rule-rollback
- ACHR News, HVACR Trade Groups Challenge EPA Refrigerant Rule in Federal Court, June 25, 2026: https://www.achrnews.com/articles/166367-hvacr-trade-groups-challenge-epa-refrigerant-rule-in-federal-court
- ACHR News, Grocers Fight to Keep EPA’s Refrigerant Deadline Extensions, July 29, 2026: https://www.achrnews.com/articles/166494-grocers-fight-to-keep-epas-refrigerant-deadline-extensions
- Holland & Knight, EPA Finalizes Changes to Technology Transitions Provisions, May 26, 2026: https://www.hklaw.com/en/insights/publications/2026/05/epa-finalizes-changes-to-technology-transitions-provisions
- Beveridge & Diamond, EPA Finalizes Targeted Relief from HFC Technology Transitions Rule, May 29, 2026: https://www.bdlaw.com/publications/epa-finalizes-targeted-relief-from-hfc-technology-transitions-rule/
- Clean Air Council v. Pruitt, No. 17-1145 (D.C. Cir. July 3, 2017): https://law.justia.com/cases/federal/appellate-courts/cadc/17-1145/17-1145-2017-07-03.html
Refrigeration Equipment Professionals (REP) is a trusted supplier of industrial refrigeration systems and surplus/used equipment, offering compressors, chillers, condensers, evaporators, ice machines, freezers, coolers, pumps, motors, complete plants, and services like purchasing, refurbishing, shipping, export crating, and storage/consignment support. With 25+ years of experience and clients across North America, Latin America, the Middle East, and Asia, we deliver reliable, cost-effective refrigeration solutions worldwide.